Point Of Reference; Updates - Raven AccuBoom Installation Manual

For rogator (liquid/airmax 180) & terragator (liquid/airmax/airspread)
Table of Contents

Advertisement

C
2
HAPTER
• Ensure the machine's hydraulic filters have been recently changed and there are no issues with the machine's
hydraulic system (e.g., pump issues, faulty hydraulic motors, fine metal deposits in the hydraulic hoses, etc.).
• Operate each of the machine's boom hydraulic functions (i.e., tilt, fold, center rack, tongue extension, or other
hydraulic valve functions) three times to ensure the machine's hydraulic valve is using fresh oil and debris is
flushed from the hydraulic hoses, valves, and filters.
• Upon installation of the AccuBoom system, operate the boom and center rack raise/lower functions through
the machine's manual control functions first before operating them via the AccuBoom controller/field
computer to ensure the hydraulic system has been installed correctly and air is released from the system.
Raven Industries recommends the following best practices when installing the AccuBoom system.
• Use part numbers to identify the parts.
• Do not remove the plastic wrap from a part until it is necessary for installation.
• Do not remove plastic caps from a part until it is necessary for installation.
Tools Needed
The following tools are recommended for installation of the AccuBoom system:
• SAE standard-sized wrenches
• Cable ties
• Set of tools

POINT OF REFERENCE

The instructions in this manual assume that you are standing behind the machine, looking toward the cab.

UPDATES

Software and manual updates are available on the Raven Applied Technology website:
6
RoGator (Liquid/AirMax 180) & TerraGator (Liquid/AirMax/AirSpread) AccuBoom™ Installation Manual
http://www.ravenhelp.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents