Download Print this page

Raven AccuBoom Parallel Installation Manual

Spra-coupe 3000 & 4000 series

Advertisement

Quick Links

Spra-Coupe 3000 & 4000 Series

Advertisement

loading

Summary of Contents for Raven AccuBoom

  • Page 1 Spra-Coupe 3000 & 4000 Series...
  • Page 3 AccuBoom system. See the Viper Installation and Operation Manual for instructions on setting up the software and using the AccuBoom system. You will also need a valid AccuBoom Control activation key for your Viper in order to activate the AccuBoom system.
  • Page 4 Manual #016-0171-013 Rev. C 01/07 Notes:...
  • Page 5: Installation

    Manual #016-0171-013 Rev. C 01/07 CHAPTER INSTALLATION ___________________________________________________________ Use the following procedure to properly install the AccuBoom system on a Spra-Coupe 3000/4000 Series sprayer using a Raven console connected to a Raven Viper. 1. Connect the AccuBoom Control Node and Relay Box to the AccuBoom Cable.
  • Page 6 2. Mount the AccuBoom Control Node and Relay Box. a. Locate a suitable mounting location on the side of the cab below the console. b. Drill two holes to mount the Parallel AccuBoom Control Node and Relay Box. c. Mount the Parallel AccuBoom Control Node P/N 063-0172-517 and the 5-Channel Driver P/N 063-0172-753 to the inside of cab below the console.
  • Page 7 Manual #016-0171-013 Rev. C 01/07 3. Connect the AccuBoom Cable to the boom switch wires. a. Remove the four screws securing the switch panel cover. b. Carefully pull the switch panel upward to access the switches. c. Locate the boom wires that parallel with the console wires.
  • Page 8 Switch Wire Positive Boom Switch Wire d. Route the two smaller wire bundles from the AccuBoom Cable P/N 115-0171-598 up into the switch location. e. Remove each boom section wire from each boom switch and substitute the corresponding boom wire from the Parallel...
  • Page 9 Manual #016-0171-013 Rev. C 01/07 3-Boom System Boom AccuBoom Connector SpraCoupe Number Wire Shielding Wire Color Number Black Un-Shielded 505B Gray Shielded 506B Brown Un-Shielded 507B Yellow Shielded 508B Blue Un-Shielded 509B Orange Shielded 510B Blk/Wht Un-Shielded Green Shielded Brn/Wht...
  • Page 10 Green Shielded 512B 4. Connect the AccuBoom Cable to the boom control switch. a. Connect the AccuBoom control switch wires from the Parallel AccuBoom Cable P/N 115-0171-598 to the previously identified positive boom connection on each boom switch, being sure to follow the Switch Connection chart.
  • Page 11 AccuBoom is enabled. 5. Connect Power and Ground to the AccuBoom Cable. a. Route the two white wires from the Parallel AccuBoom Cable P/N 115-0171-598 to a secure battery ground. Helpful Hint: The main ground lug is located under the dash in the right hand corner of the cab.
  • Page 12 Master Spray/Hold Switch Connection 6. Connect the orange wire from the Parallel AccuBoom Cable P/N 115- 0171-598 to the master boom enable switch on the machine. a. Pull the joystick cable connectors out from under the side console. b. Identify the master spray/hold switch connector.
  • Page 13 Manual #016-0171-013 Rev. C 01/07 7. Connect the 15 pin D-sub connector from the Parallel AccuBoom Cable P/N 115-0171-598 to the Auxil1ary connector on the Viper 115-0171-256 interface cable. 8. The Parallel AccuBoom hardware installation is now complete. Install the...
  • Page 14 Manual #016-0171-013 Rev. C 01/07 Notes:...
  • Page 15 RAVEN INDUSTRIES LIMITED WARRANTY WHAT IS COVERED? This warranty covers all defects in workmanship or materials in your Raven Flow Control Product under normal use, maintenance, and service. HOW LONG IS THE COVERAGE PERIOD? This warranty coverage runs for 12 months from the purchase date of your Raven Flow Control Product.
  • Page 16 P.O. Box 5107 www.ravenprecision.com Sioux Falls, SD 57117-5107 fcdinfo@raveind.com Notice: This document and the information provided are the property of Raven Industries, Inc. and May only be used as authorized by Raven Industries, Inc. All rights reserved under the copyright laws.