Secure the busway drop box to the retaining hardware bracket by using a socket wrench to insert and
4.
tighten a bolt (4).
Connect the PDUs to the busway drop box (1).
5.
Turn the power on by closing both breakers on the busway drop box (2).
6.
Removal and replacement procedures 27
Need help?
Do you have a question about the Performance Optimized Datacenter 20c and is the answer not in the manual?