Volkswagen Phaeton 2003 Workshop Manual page 44

6-cylinder injection engine
Hide thumbs Also See for Phaeton 2003:
Table of Contents

Advertisement

Phaeton 2003 ➤
6-cylinder injection engine - Edition 02.2014
Special tools and workshop
equipment required
♦ Counterhold - T10069-
♦ Assembly tool - T10215-
♦ Torque wrench - V.A.G
1601-
♦ Torque wrench - V.A.G
1332-
Removing
– Set lock carrier to service position ⇒ General body repairs,
exterior; Rep. gr. 50 ; Service position .
– Remove poly V-belt
– Remove vibration damper. To do this, lock vibration damper
using counterhold - T10069- .
– Remove sump
⇒ page 101
– Unbolt sealing flange.
– Remove remaining sealant from sealing surfaces.
Installing
– Remove oil residue from crankshaft journal using clean cloth.
38
Rep. gr.13 - Crankshaft group
⇒ page 28
.
.

Advertisement

Table of Contents
loading

Table of Contents