Phaeton 2003 ➤
6-cylinder injection engine - Edition 02.2014
– Secure the bolts in the following positions: left engine support
-1-: C6 and D5; right engine support -2-: E6 and F5.
– Remove both middle gearbox console bolts -arrows-.
– Position assembly platform under power unit. The engine sup‐
ports must be guided into their respective mountings:
A - Mountings on left of engine -arrows-
B - Mountings on right of engine -arrows-
12
Rep. gr.10 - Removing and installing engine