Rack Mounting - Imagine communications Selenio SNP-GW-3GX32 User Manual

Network processor ip media processing platform
Table of Contents

Advertisement

Selenio™ Network Processor
User Guide
After unpacking the frame, and before installing into a console or rack, allow at least 30 minutes for
temperatures to equalize and to eliminate any condensation that may have developed. SNP frames
require an ambient temperature of between 32°F and 95°F (0°C to 35°C) with relative humidity of 10%
to 90% non-condensing.

Rack Mounting

Although the pre-installed frame-mounting ears provide the main support for the SNP within a rack, you
must install arms, brackets, and a cable relief bar at the rear of the unit to support the weight of cabling
and frame stacking.
The following items are included in kit 158-100081Q00:
Rear support arms (164-000306Q00)
Cable tie bar (164-000305Q00)
Brackets (164-100556Q00)
Bracket screws (4-40X1/4 PH_Q)
Tie bar screws (6-32X3/8 PH)
Figure 3: Mounting Ear on Front Panel
The following procedure describes how to install the rack supports.
© 2019 Imagine Communications Corp.
Proprietary and Confidential.
Installation
May 2019 | Page 23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Selenio snp-gw-3gx32-hs-qf

Table of Contents