Installing The Power Supply; Hot-Swappable Power Supply - Imagine communications Selenio SNP-GW-3GX32 User Manual

Network processor ip media processing platform
Table of Contents

Advertisement

Selenio™ Network Processor
User Guide
3. Push the tip of the ejector lever and then pull first to release the handle, and then to remove the
power supply from the chassis.

Installing the Power Supply

1. Line the power supply up with the space provided and slide it gently in until it will not go any
further.
2. Push the ejector lever until it is flush with the power supply.
3. Slide the safety lever to the right.
4. Screw the safety lever with a screwdriver until it is "finger tight".
Before returning your SNP to full operation, you must reattach the front panel. See
Panel
(on page 139) for more information.

Hot-Swappable Power Supply

To remove and install the hot-swappable power supply (170-101403Q00), see the following topics:
Removing the Individual Hot-Swappable Power Supply (on page 142)
Installing the Hot-Swappable Power Supply (on page 144)
© 2019 Imagine Communications Corp.
Proprietary and Confidential.
Servicing
Installing the Front
May 2019 | Page 141

Advertisement

Table of Contents
loading

This manual is also suitable for:

Selenio snp-gw-3gx32-hs-qf

Table of Contents