Installing The Main Pcb Assembly - Imagine communications Selenio SNP-GW-3GX32 User Manual

Network processor ip media processing platform
Table of Contents

Advertisement

Selenio™ Network Processor
User Guide
2. Park it straightened and out of the way.
3. Turn the captive thumb screw to release the board from the chassis base. It will spring when
released.
4. Holding the ejectors at the left and right ends of the board, press the ends and then slide them first
open 15-20 degrees and then slide the board out of the frame.

Installing the Main PCB Assembly

1. Line the main board up with the space provided and slide it gently in until it will not go any further.
2. Push the plate below and to the right of the thumbscrew.
3. Push the ejectors at the left and right of the board firmly and evenly until the board will go no
further.
4. Press the ejectors in so they are at a right angle to the frame and the clips at the ends are engaged.
5. Tighten the thumb screw.
6. Carefully replace the fly-over, lining it up to slide evenly into the connector.
Before returning your SNP to full operation, you must reattach the front panel. See
Panel
(on page 139) for more information.
© 2019 Imagine Communications Corp.
Proprietary and Confidential.
Servicing
Installing the Front
May 2019 | Page 146

Advertisement

Table of Contents
loading

This manual is also suitable for:

Selenio snp-gw-3gx32-hs-qf

Table of Contents