BainUltra THERMOMASSEUR Owner's Manual page 8

Hide thumbs Also See for THERMOMASSEUR:
Table of Contents

Advertisement

THERMOMASSEUR
Install to permit access for servicing.
The following instructions apply to both
rectangular and corner baths.
1. ALCOVE INSTALLATION
(BETWEEN 2 OR 3 WALLS)
1-1
Place level lengthwise on decking of
the ThermoMasseur
placing shims under ThermoMasseur
where necessary. Repeat exercise
width wise on the bath. Glue shims in
place with a drop of silicone.
1-2
Mark position of wooden supports
to be attached to the wall by tracing
a line underneath the deck of the bath.
1-3
Pull the ThermoMasseur out.
1-4
Align the wooden supports [at least
11/2" (3.8 cm) thick] with markings
and nail into place on the wall studs.
Plan for notch on wooden supports
for installation of a skirt if necessary
1-5
Reposition the ThermoMasseur and
verify that it is level.
IMPORTANT
• The ThermoMasseur must sit entirely on its base with the lip supported by a wooden structure.
• The ThermoMasseur must be level.
• The ThermoMasseur is molded with an integrated slope towards the drain.
If decking around the ThermoMasseur is level, the bath will drain accordingly.
8
®
INSTALLATION
and adjust by
®
1 - 1
"
1/2
[2.5 à 3.8 cm]
1 800 463.2187
OWNER'S MANUAL | INSTALLATION INSTRUCTIONS
The BainUltra ThermoMasseur
install as a conventional bath. The following instruc-
tions outline steps to follow for the main types of
installation.
1-2
1-2
A A
Monday to Thursday from 8 a.m. to 6 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © June 2020 BainUltra Inc. All rights reserved. 45200001
is almost as easy to
®
1-1
1-1
1-4
1-4
1-3
1-3
1-5
1-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents