Balneo - Naos & Sanos Installation - BainUltra THERMOMASSEUR Owner's Manual

Hide thumbs Also See for THERMOMASSEUR:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS | OWNER'S MANUAL
1. BATH SITE
1-1
O nce the floor has been finished and
is perfectly level, place ThermoMas-
seur
in the exact chosen location.
®
Trace the outline of the bath with an
erasable marker.
1-2
Remove the ThermoMasseur and care-
fully place it upside down on a blanket
or corrugated cardboard (ex. the box in
which it was delivered).
1-3
O n the floor, determine by referring to
measurements taken underneath the
bath, the exact location of the drain,
the air pipe, and the two anchoring
points at each end of the bath.
2. INSTALLATION
2-1
I nstall the drain and overflow set on
the bath and the first section of the
air intake pipe (1 1/2'' ABS) under the
floor.
2-2
Apply a silicone joint to the base rim.
2-3
Put the ThermoMasseur in place and
put pipes through the floor, ensuring
bath is aligned with anchoring points.
For Geysair-equipped baths, also run
the water hose and electrical wiring
through the floor.
2-4
Wipe off excess silicone immediately.
www.bainultra.com
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
BALNEO
- NAOS & SANOS
®
Bottom view
Horizontal –
Anchoring
Point
Horizontal – Drain
INSTALLATION
1-1
1-1
Vertical –
Anchoring
Point
Vertical –
Air Intake
Pipe
Vertical –
Drain
1 1 - - 3 3
2-2
2-2
2-1
2-1
2-3
2-3
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents