BainUltra THERMOMASSEUR Owner's Manual page 18

Hide thumbs Also See for THERMOMASSEUR:
Table of Contents

Advertisement

BALNEO
- NAOS & SANOS
®
2. INSTALLATION (cont'd)
2-5
For Geysair-equipped baths, connect
the Geysair electrical wire with the
male connector with the turbine cable
equipped with the female connector.
Test for grounding continuity between
the bath grounding terminal
the bath power supply. Failure to
perform the grounding continuity test
could result in serious personal injury.
2-6
For Geysair-equipped baths, the Gey-
sair unit must be connected to the hot
water supply with a 3/8 male compres-
sion or 1/2" male NPT hose bibb. A
T and a valve (not supplied) must be
installed at the hot water intake.
LEAK TEST
Once plumbing is fully installed and before
beginning any other work, fill the ThermoMas-
seur
to overflow and wait 30 minutes. Check all
®
plumbing hook-ups and bath for leaks. BainUltra
is not responsible for any water damage caused
by improper installation (see Warranty section).
ELECTRICITY
Install turbine and InMix power module con-
nections according to specifications outlined in
the Mia ELECTRICAL INSTALLATION - TURBINE
section.
NOTES
• Since these models sit directly on the floor, the overflow drain pipe opening is factory-drilled.
• To install the Naos or Sanos on a concrete slab with no access below for air entry to the bath: a hole
of 1 5/8 inch (4.1 cm) in diameter must be drilled into the bath skirt to allow air supply to the bath.
IMPORTANT: Do not drill above height of existing hole in the skirt intended to connect drain to overflow.
18
OWNER'S MANUAL | INSTALLATION INSTRUCTIONS
INSTALLATION
2-5
and
1 800 463.2187
Monday to Thursday from 8 a.m. to 6 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © June 2020 BainUltra Inc. All rights reserved. 45200001
Turbine Female
Connector
Geysair Male
Connector
Ground Wire
for the Bathtub

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents