DRILLING ACRYLIC FOR FAUCETS
The drain and overflow openings are factory-
drilled. However, drilling may be necessary to
install faucets. Drilling acrylic is a very delicate
operation.
LEAK TEST
Once the plumbing installation is complete and
before tile or any other related work begins, fill
the bath to the overflow and wait thirty minutes.
Check all plumbing hook-ups and bath for leaks.
BainUltra is not responsible for any water dam-
age caused by leaks due to improper installa-
tion (see WARRANTY section).
1. DRILLING
1-1
Drill a 1/16" guide hole before using
the hole saw.
1-2
Use a hole saw in good condition to
avoid accidental scratches. The center
guide bit should extend 1/4" (0.6 cm)
for correct drill positioning.
IMPORTANT
• Do not remove the protective plastic film (peel coat) on the bath and place a drop-cloth in the
ThermoMasseur during installation to protect acrylic.
• To avoid drilling in an air intake zone or, an electric component, always check under deck
before drilling.
• Drill openings slightly larger than actual faucet size. This is to avoid any possible cracking or
other damage to the acrylic.
• When installing faucets, do not over-tighten fittings, as this may damage the acrylic.
• This type of damage is not covered by the warranty.
• Drill at medium speed and do not apply pressure to drill; let the drill do the work.
• The temperature of the water heater should not exceed preset and/or recommended levels by
the manufacturer. This may cause a thermal shock to the acrylic and will not be covered by the
warranty.
www.bainultra.com
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
THERMOMASSEUR
All plumbing installations must be carried out by
a certified plumber. Installation of a ThermoMas-
seur
is the same as for regular acrylic baths. Pay
®
close attention to the following when installing the
ThermoMasseur :
1-1
1-1
®
PLUMBING INSTALLATION
"
1/4
[0.6 cm]
"
1/16
1-2
1-2
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents