THERMOMASSEUR
1. DROP-IN INSTALLATION
1-1
Prepare the site to connect the
plumbing and turbine.
1-2
Build the (2" x 3") wooden structure
taking into account the thickness of
the ceramic tiles and the plywood as
well as the height of the bath.
NOTE: Plan air intake for turbine.
1-3
Secure plywood into place with screws
around and above structure.
1-4
Cut inside 1 1/2" of the outside dimen-
sions of the tub.
1-5
E nsure bath is levelled and that it fits
properly in cutout.
NOTE: Protect turbine and accessories
as you insert bath.
1-6
I nstall desired finishing materials on
top and perimeter of tub box (ceramic-
tiles, granit, marble or other) .
1-7
Set bath back into place and conduct
plumbing and turbine connection.
NOTE
• Baths with AromaCloud
the deck for the AromaCloud housing. This extra cutout is required when the housing
is less than 1.5 inch from the edge of the bath.
IMPORTANT
• The ThermoMasseur must sit entirely on its base with the lip supported by a wooden structure.
• The ThermoMasseur must be level.
• The ThermoMasseur is molded with an integrated slope towards the drain. If decking around the
ThermoMasseur is level, the bath will drain accordingly.
12
OWNER'S MANUAL | INSTALLATION INSTRUCTIONS
®
PLUMBING INSTALLATION
* See specification sheet of bath for exceptions.
factory installed by BainUltra may require an additional cutout on
®
1 800 463.2187
Monday to Thursday from 8 a.m. to 6 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
1
"
1/2
[3.8 cm]
Printed in Canada. Copyright © June 2020 BainUltra Inc. All rights reserved. 45200001
Edge of bath
Ceramic, marble,
granit or other
Plywood
2" x 3"
structure