NOKORI COLLECTION ® IMPORTANT SAFETY INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS PERTAINING TO RISKS OF FIRE, ELECTROCUTION OR PERSONAL INJURY READ AND FOLLOW ALL INSTRUCTIONS • SAVE THESE INSTRUCTIONS THIS DOCUMENT SUPERCEDES THE INSTALLATION INSTRUCTION IN THE OWNER’S MANUAL. WARNINGS • Risk of hyperthermia; people using medication and/or having an adverse medical history should consult a physician before using a Hydro-thermo massage ®...
Page 4
• Once plumbing is fully installed and before beginning any other work, fill the ThermoMasseur with water to overflow level ® and wait 30 minutes. Check all plumbing hook-ups and bath for leaks. BainUltra is not responsible for any water damage ®...
NOKORI BATH ® INSTALLATION INSTRUCTIONS PARTS & TOOLS A. STANDARD PARTS - PLUMBING DESCRIPTION Plated drain clicker Rubber seal Brass drain shoe Nylon conic shaped seal for drain Brass nut 4 in. brass tailpiece Brass overflow to drain pipe Nylon flat seal with flange 1-1/2 in.
ThermoMasseur which includes information such as necessary ® ® dimensions of site before installation. If you do not already have the technical specifications, download from the BainUltra Web site at: bainultra.com ® or call us at: 1 800 463-2187. www.bainultra.com...
31’’ ’’ 24’’ NOTE: Detailed plan is provided in the Documentation / Installation User Guides section of Nokori bath models on our Web site bainultra.com. 1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Page 9
32 ” 9 ” ” ” 7” NOTE: Detailed plan is provided in the Documentation / Installation User Guides section of Nokori bath models on our Web site bainultra.com. PLUMBING HELPFUL TIP: • Carefully place the tub on its side, on a blanket or a corrugated cardboard.
Page 11
WARNINGS • Access to Geysair backflow preventer is necessary for cleaning of the filter. ® • Baths from Nokori collection cannot be drilled for faucet installation. Faucets must be freestanding ® or wall-mounted models. • Geysair component cannot be remote mounted. It must stay at original position, attached to bath.
Page 13
NOKORI BATH ® INSTALLATION INSTRUCTIONS REMOTE MOUNTING OF TURBINE WITH ACCESS UNDER BATH BATH INSTALLATION HELPFUL TIPS: • Carefully place the tub on its side, on a blanket or a corrugated cardboard. • To easily manipulate the bathtub in a safe way during installation, we recommend using moving straps.
Page 15
NOKORI BATH ® INSTALLATION INSTRUCTIONS PARTS AND TOOLS REQUIRED REMOTE MOUNTING OF TURBINE WITH ACCESS UNDER BATH REMOTE MOUNTING OF TURBINE Bottom of door When located in an enclosed location. Floor 1” WARNINGS • Choose a location for the turbine with the shortest possible distance from the Thermomasseur bath, no more ®...
Page 17
NOKORI BATH ® INSTALLATION INSTRUCTIONS PARTS AND TOOLS REQUIRED REMOTE MOUNTING OF TURBINE WITH ACCESS UNDER BATH REMOTE MOUNTING OF TURBINE – ELECTRICAL CONNECTIONS OF OPTIONAL THERAPIES • See page 18 for electrical diagram. Match the colors of the plug-in cables with those...
Page 19
NOKORI BATH ® INSTALLATION INSTRUCTIONS PARTS AND TOOLS REQUIRED REMOTE MOUNTING OF TURBINE WITH ACCESS UNDER BATH ELECTRICAL DIAGRAM – THERMOMASSEUR 15A CIRCUIT 20A CIRCUIT NEUTRAL N L LOAD NEUTRAL N L LOA GROUND FAULT CIRCUIT INTERRUPTERS JUNCTION TURBINE WITH GEYSAIR...
REMOTE MOUNTING OF TURBINE PIPING & WIRING UNDER FLOOR & NO ACCESS UNDER BATH PLUMBING – FLOOR LAYOUT FOR PIPES AND ACCESS Opening for Island Tub Drain Recommended zone for optional components DIMENSIONS (IN.) NOKORI 6935 69’’ 35’’ 28’’ NOKORI 7131 70-1/2’’ 31’’...
Page 22
32 ” ” ”” ” 7” NOTE: Detailed plan is provided in the Documentation / Installation User Guides section of Nokori bath models on our Web site bainultra.com. PLUMBING HELPFUL TIP: Carefully place the tub on its side, on a blanket or a corrugated cardboard.
Page 23
NOKORI BATH ® INSTALLATION INSTRUCTIONS PARTS AND TOOLS REQUIRED REMOTE MOUNTING OF TURBINE PIPING & WIRING UNDER FLOOR & NO ACCESS UNDER BATH PLUMBING HELPFUL TIP: Carefully place the tub on its side, on a blanket or a corrugated cardboard.
Page 25
NOKORI BATH ® INSTALLATION INSTRUCTIONS PARTS AND TOOLS REQUIRED REMOTE MOUNTING OF TURBINE PIPING & WIRING UNDER FLOOR & NO ACCESS UNDER BATH BATH INSTALLATION HELPFUL TIPS: • Carefully place the tub on its side, on a blanket or a corrugated cardboard.
Page 27
NOKORI BATH ® INSTALLATION INSTRUCTIONS PARTS AND TOOLS REQUIRED REMOTE MOUNTING OF TURBINE PIPING & WIRING UNDER FLOOR & NO ACCESS UNDER BATH BATH INSTALLATION DRAIN CONNECTION WITH ISLAND TUB DRAIN (ITD) – INFORMATION ® WARNING • Refer to supplied instructions for ISLAND TUB DRAIN ®...
NOKORI BATH ® INSTALLATION INSTRUCTIONS PARTS AND TOOLS REQUIRED REMOTE MOUNTING OF TURBINE PIPING & WIRING ABOVE FLOOR & NO ACCESS UNDER BATH PLEASE FOLLOW THESE INSTRUCTIONS IF YOU HAVE NO POSSIBILITY TO RUN AIR PIPES AND ELECTRICAL WIRING UNDER THE FLOOR.
Page 31
NOKORI BATH ® INSTALLATION INSTRUCTIONS REMOTE MOUNTING OF TURBINE PIPING & WIRING ABOVE FLOOR & NO ACCESS UNDER BATH TURBINE & GEYSAIR INSTALLATION (FOR THERMOMASSEUR ® PASSAGE FOR THE AIR INLET PIPE AND ELECTRICAL WIRING OF OPTIONAL THERAPIES • Air pipe* •...
Page 33
NOKORI BATH ® INSTALLATION INSTRUCTIONS PARTS AND TOOLS REQUIRED REMOTE MOUNTING OF TURBINE PIPING & WIRING ABOVE FLOOR & NO ACCESS UNDER BATH FOR NEXT STEPS SEE SECTION: INSTALLATION – REMOTE MOUNTING OF TURBINE WITH ACCESS UNDER BATH ELECTRONIC CONTROL INSTALLATION – MIAPLUS ®...
31’’ ’’ 24’’ NOTE: Detailed plan is provided in the Documentation / Installation User Guides section of Nokori bath models on our Web site bainultra.com. 1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Page 35
NOKORI BATH ® INSTALLATION INSTRUCTIONS TURBINE FACTORY INSTALLED WITH ACCESS UNDER BATH PLUMBING HELPFUL TIP: Carefully place the tub on its side, on a blanket or a corrugated cardboard. Measure & Align (2x) Flexible Overflow Piping A. STANDARD PARTS - PLUMBING...
Page 37
NOKORI BATH ® INSTALLATION INSTRUCTIONS PARTS AND TOOLS REQUIRED TURBINE FACTORY INSTALLED WITH ACCESS UNDER BATH AIR VENT OPENING – POSSIBLE LOCATIONS OPENINGS – POSSIBLE LOCATIONS OPPOSITE SIDE OF BACKREST LEFT HAND SIDE RIGHT HAND SIDE SIDE OF BACKREST ...
Page 39
LOCATION: Determine the most convenient location, on the wall close to tub. Peel off the protective film of sticker behind the control. You can add a silicone bead to secure to the wall. WARNINGS • Baths from Nokori ® collection cannot be drilled for faucet installation. Faucets must be freestanding or wall-mounted model •...
Page 41
NOKORI BATH ® INSTALLATION INSTRUCTIONS TURBINE FACTORY INSTALLED WITH ACCESS UNDER BATH BATH INSTALLATION HELPFUL TIPS: • Carefully place the tub on its side, on a blanket or a corrugated cardboard. • To easily manipulate the bathtub in a safe way during installation, we recommend using moving straps.
70-1/2’’ 31’’ 24’’ NOTE: Detailed plan is provided in the Documentation / Installation User Guides section of Nokori bath models on our Web site bainultra.com. 1 800 463.2187 Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Page 43
NOKORI BATH ® INSTALLATION INSTRUCTIONS TURBINE FACTORY INSTALLED WIRING UNDER FLOOR & NO ACCESS UNDER BATH PLUMBING HELPFUL TIP: Carefully place the tub on its side, on a blanket or a corrugated cardboard. WARNING • Refer to supplied instructions for Island Tub Drain installation.
Page 45
NOKORI BATH ® INSTALLATION INSTRUCTIONS TURBINE FACTORY INSTALLED WIRING UNDER FLOOR & NO ACCESS UNDER BATH BATH INSTALLATION WARNINGS • Be sure the floor is leveled. Use shims as needed. • Do not remove the protective plastic film on the tub and place a drop-cloth in the tub during installation to protect the acrylic.
TILE FLANGE When installing the bath against one, two or three walls, a tile flange can be helpful to have the perfect finish to the installa- tion. A tile flange, not factory installed, can be ordered with a Nokori ®...
Need help?
Do you have a question about the NOKORI and is the answer not in the manual?
Questions and answers