BainUltra THERMOMASSEUR Owner's Manual page 13

Hide thumbs Also See for THERMOMASSEUR:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS | OWNER'S MANUAL
1. UNDERMOUNT INSTALLATION
1-1
Prepare the site to connect the
plumbing and turbine.
1-2
Build the (2" x 3") levelled wooden
structure with plywood as in Detail A,
taking into account the thickness of
the ceramic tiles and the plywood as
well as the height of the bath.
NOTE: Plan air intake for turbine.
1-3
Ensure bath is levelled.
NOTE: Protect turbine as you insert
bath.
1-4
Connect plumbing and turbine .
1-5
Secure plywood into place around and
above the structure.
NOTE: Plan air intake for turbine.
1-6
I nstall desired finishing materials on
top and perimeter of tub box (ceramic-
tiles, granit, marble or other) .
1-7
Apply seal to junction of ceramic tiles
with ceramic grout and/or silicone.
IMPORTANT
• The ThermoMasseur must sit entirely on its base with the lip supported by a wooden structure.
• The ThermoMasseur must be level.
• The ThermoMasseur is molded with an integrated slope towards the drain. If decking around the
ThermoMasseur is level, the bath will drain accordingly.
www.bainultra.com
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
THERMOMASSEUR
1"
[2.5 cm]
®
PLUMBING INSTALLATION
Edge of bath
2" x 3"
structure
Detail A
Ceramic, marble,
granit or other
Plywood
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents