Third Trip to Site: Startup Phase
•
Perform a visual inspection to confirm that all work was completed per Ortal specifications.
•
Confirm that gas and electric are properly connected and live.
•
Remove the safety barrier and glass.
•
Clean the inside of the unit.
•
Confirm operation and remote-control setup.
•
Set up the media per Ortal specifications.
•
Remove protective layers and clean glass.
•
Install the glass and safety barrier.
•
Go over operation of the unit and remote with the homeowner.
•
Set up return visit to clean glass after initial burn-off period.
70