Clearance & Finish Diagrams; General Clearance Requirements - ORTAL 40 Series Installation And Operation Manual

Built-in models
Table of Contents

Advertisement

General Clearance Requirements

Maintain clearances as shown in the figures below. Clearances are to non-combustible materials, or 5/8" Type X
drywall or its equivalent.
FRONT (F) & TRADITIONAL (TR)
LEFT SIDE (LS)
SPACE CREATOR (SC)
Ortal Installation Manual: Built-in Models, December 2019 (V2)
Clearance & Finish Diagrams
TUNNEL (TN)
RIGHT SIDE (RS)
THREE SIDES (TS)
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents