PCIe IP Prototyping Kit Installation Guide
Figure 1-12 ARC SDP DIP Switches Configuration
OFF
1
2
3
4
5
6
7
OFF
1
2
3
4
5
6
7
8
9
OFF
1
2
3
4
5
6
7
4.
Complete the following hardware power-up sequence to ensure proper inter-board communication.
a.
Power up the HAPS-80 board. Connect the HAPS-80 power supply.
During the power-up sequence, the supervision LEDs (RESET, READY, ALERT, and PWR)
change color. After a successful power-up sequence, all LEDs must be green (see
"Status
LEDs", section A.2).
The LED marked UDONE indicates if the FPGA is configured.
5.60a
March 2020
SW2501
ON
ARC EM6
Boot Mode Select
ARC EM6
Boot Mirror Select
ARC EM6
Boot Location
Select
SW2503
ON
AS221 core #1
Boot Mode Select
AS221 core #1 and core
#2
Boot Mirror Select
AS221 core #1 and core
#2
Boot Location Select
AS221 core #1
Boot Mode Select
SW2502
ON
ARC 770
Boot Mode Select
ARC 770
Boot Mirror Select
ARC 770
Boot Location
Select
SW2401
OFF
ON
Start ARC EM6
Start AS221 core
GPIO [20]
#2 GPIO [23]
SW2504
SW2507
SW2506
SW2505
Start ARC 770
Start AS221 core
GPIO [21]
#1 GPIO [22]
Synopsys, Inc.
Setting Up Hardware Components
For application purposes
Pre-Bootloader mode of operation