Installing and Removing Power Components
Figure 40: Securing the PM to the Shelf
Step 4
Fill the power shelf to the required configuration.
What to do next
After the modular configuration PMs are installed in the chassis, install power module slot covers in empty
PM slots, if any. For more information, see
Removing a Modular Configuration Power Module
This section describes how to remove a PM from a modular configuration power shelf.
Removing a Modular Configuration Power Module
Installing a Power Module Slot
Installing and Removing Power Components
Cover.
73