Download Print this page

Cisco CRS-16 DC Installing And Removing page 20

Installing and removing power components

Advertisement

Required Tools and Equipment
Required Tools and Equipment
You need the following tools to perform this task:
• ESD-preventive wrist strap
• 10-mm socket wrench
• Stripping tool to remove power cable conductor insulation
• 1/4-in. x 6-in. long slotted screwdriver
• Torque screwdriver with 1/4-in. slotted head and rated accuracy at 9 in-lb (1.04 N-m)
• Torque wrench with 10-mm 6 pt. socket and rated accuracy at 20 in.-lb (2.26 N-m)
AC Wye Power Shelf
The AC Wye power shelf arrives with a 5-wire Wye cord and an IEC 60309 plug rated 415 V/32 A, IP44,
3W+N+PE; it is 4 meters long. The power shelf has five corresponding terminations: three active (hot), one
neutral, and one ground. The ground lug and terminal block are located behind a removable cover on the rear
of the power shelf. The terminal block contains four terminations to attach the three active cable conductors
and one neutral cable conductor from the input power cord. The ground cable conductor from the input power
cord is attached to the ground lug.
The rear of the AC Wye power shelf with the rear cover removed is shown in this figure.
Figure 12: AC Wye Power Shelf Rear
1
Lead 1 (L1)
2
Lead 2 (L2)
3
Lead 3 (L3)
Note
Leads 1, 2, and 3 (L1, L2, and L3) are not associated with any particular color of cable conductor because
they are not connected to neutral (L4) or the safety ground (L5).
Installing and Removing Power Components
20
4
Lead 4 (L4, neutral)
5
Ground
Installing and Removing Power Components

Advertisement

loading

This manual is also suitable for:

Crs-16 ac