Download Print this page

Cisco CRS-16 DC Installing And Removing page 54

Installing and removing power components

Advertisement

Steps
3. Attach the shelf grounding bracket to both power shelves using the four M6 hex head bolts provided. Do
not tighten (see the next figure).
4. Attach the grounding L-bracket to the shelf grounding bracket using the two M6 hex nuts provided. Do
not tighten (see the next figure).
5. Attach the grounding L-bracket to the chassis using the two M6 hex bolts provided. Using the torque
wrench, tighten the M6 hex bolts to a torque of 20 in.-lb (2.26 N-m).
6. Using the torque wrench, tighten the four M6 hex bolts attaching the grounding bracket to the power
shelves to a torque of 20 in.-lb (2.26 N-m).
7. Using the torque wrench, tighten the two M6 hex nuts attaching the grounding L-bracket to the power
shelf to a torque of 20 in.-lb (2.26 N-m).
DETAILED STEPS
Step 1
Attach the ESD-preventive wrist strap to your wrist and connect its leash to one of the ESD connection sockets on the
front (PLIM) side of the chassis or a bare metal surface on the chassis.
Step 2
Align the shelf grounding bracket with the power shelves.
Step 3
Attach the shelf grounding bracket to both power shelves using the four M6 hex head bolts provided. Do not tighten (see
the next figure).
Step 4
Attach the grounding L-bracket to the shelf grounding bracket using the two M6 hex nuts provided. Do not tighten (see
the next figure).
Installing and Removing Power Components
54
Installing and Removing Power Components

Advertisement

loading

This manual is also suitable for:

Crs-16 ac