Download Print this page

Cisco CRS-16 DC Installing And Removing page 68

Installing and removing power components

Advertisement

Installing a Modular Configuration Alarm Module
Figure 37: Cord Being Removed from Cord Clamp
1
Screw that secures the cord clamp
2
Cord to be inserted into clamp
In the figure, the AC cord clamp shown on the left was available until June 2011, and the AC cord clamp shown
Note
on the right is available from June 2011 onwards. The location of the screw that secures the cord in the cord
clamp is different.
Step 2
Remove the cords from the cord clamps.
What to do next
After you remove the DC wiring and DC terminal block covers or AC cords, remove the power shelf. See
Removing a Modular Configuration Power
Installing a Modular Configuration Alarm Module
This section describes how to install the alarm modules in a modular configuration power shelf in the LCC.
This figure shows a modular configuration alarm module.
Installing and Removing Power Components
68
Installing and Removing Power Components
Shelf.

Advertisement

loading

This manual is also suitable for:

Crs-16 ac