Cisco CRS-16 DC Installing And Removing page 64

Installing and removing power components

Advertisement

Removing AC or DC Power Shelf Wiring
DETAILED STEPS
Step 1
Insert the cord into the cord clamp.
Note
If you have a Cisco CRS PDU installed, the AC power cords must be installed as labeled. For further information,
see Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide.
Figure 35: Cord Being Inserted into Cord Clamp
1
Screw that secures the cord clamp
2
Screwdriver tightening screw
In the figure, the AC cord clamp shown on the left was available until June 2011, and the AC cord clamp shown
Note
on the right is available from June 2011 onwards. The location of the screw that secures the cord in the cord
clamp is different.
Step 2
Use the screwdriver to tighten the screw that clamps the cord in place.
What to do next
After you install the DC input cables and DC terminal block covers, or AC input cords, install the alarm
module (see
Removing AC or DC Power Shelf Wiring
This section describes how to remove the DC input wiring, DC terminal blocks and AC cords from the rear
of the power shelf on the LCC.
Installing and Removing Power Components
64
3
Cord to be inserted into clamp
Installing a Modular Configuration Alarm
Installing and Removing Power Components
Module).