Mounting Procedures - ClipperCreek CS 3-Phase Installation Manual

Table of Contents

Advertisement

CS 3-Phase Installation Manual

MOUNTING PROCEDURES

1. Locate the wall mounting position of the EVSE:
Position the bottom of the EVSE enclosure 38" above the
ground.
The mounting holes are spaced 16" apart to accommodate
common wall studs.
If there is no solid structural framing on those centers, provide
an adequate alternative mounting surface for the EVSE.
Figure 2. CS 3-Phase Installation Template
Page 12

Advertisement

Table of Contents
loading

Table of Contents