Testing After Installation - ClipperCreek CS 3-Phase Installation Manual

Table of Contents

Advertisement

CS 3-Phase Installation Manual
Only four wires are needed to wire the CS 3-Phase (Line 1,
Line 2, Line 3, and Service Ground), as shown in Figure 7.
Wire the unit from the breaker panel using wire sized according
to local electrical codes. The circuit breaker should be rated to
the appropriate size for the current draw. Derating a three phase
breaker 20% for continuous duty allows for 80% of continuous
current. For example, derating an 80A three phase breaker 20%
for continuous duty allows 64A of continuous current.
The three phases (Line 1, Line 2, & Line 3) are terminated on
the input side of the contactor itself, as shown in Figure 7. The
Service Ground is terminated on the Ground Terminal at the
bottom of the inner chassis.
Be careful not to damage the PC Board when removing the
power-entry knockout, attaching the conduit, or when wiring
the service conductors to the contactor.

Testing After Installation

Apply utility power, and observe that only the Diagnostic LED
flashes on the circuit board. If it does not flash, the board may
be defective.
The Charge Test buttons on the PC board simulate connection
to a vehicle. Push and hold the two Charge Test buttons at the
same time. The contactor should close, and the large Green
CHARGING light should turn on.
If a vehicle is available, connect the CS 3-Phase to the vehicle
and verify that the contactor closes and the Green CHARGING
light turns on.
INSTALLATION IS COMPLETE.