Mounting Procedures - ClipperCreek LCS Series User Manual

With isolation monitor for 230vac
Hide thumbs Also See for LCS Series:
Table of Contents

Advertisement

LCS 230VAC Isolation Monitor User's Manual

MOUNTING PROCEDURES

Locate the wall mounting position of the EVSE:
The three LCS service conductors are shielded by a 3 foot (0.9m) flexibl
conduit. The LCS must be positioned such that this conduit can reach a
nearby service panel or junction box.
Position the bottom of the charge station at a comfortable height and at least
18 inches (0.45m) above the ground. Ensure that the LEDs on the front
panel of the EVSE can clearly be seen by anyone who will be operating the
device.
The LCS has four mounting holes spaced in a 2" (50.8mm) wide by 10"
(254mm) tall rectangular pattern. Use a template to mark hole locations on
the wall.
For Hollow-Wall Construction:
Place the unit such that at least two (but preferrabley all four)
mounting holes can take advantage of solid structural framing inside
of the wall or a strong wall surface such as plywood.
For any remaining mounting holes which do not have a solid
mounting structure (such as drywall without a solid backing) it will
be necessary to use proper anchoring hardware such as drywall
toggles or molly bolts.
For Solid-Wall Construction:
To secure the unit in concrete, pre-drill appropriately sized holes and
use multi-set or wedge anchor hardware at all four mounting points.
To secure the unit in brick or stone, pre-drill appropriately sized
holes and use sleeve anchors at all four mounting points.
Figure 5. Mounting the LCS to a hollow wall
Page 8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lcs-15Lcs-25Lcs-20Lcs-30

Table of Contents