Operation; Front Panel - ClipperCreek CS 3-Phase Installation Manual

Table of Contents

Advertisement

CS 3-Phase Installation Manual

OPERATION

The CS 3-Phase EVSE is a conductive EVSE that provides
the Electric Vehicle (EV) user with a safe and manageable link
between the power grid and the electric vehicle.
Figure 1. The CS 3-Phase Front Panel
Remove the charging connector from its holder and plug it into the
vehicle's charge port. If there is a mechanical latch that holds the
connector firmly while charging, be sure the latch has "clicked"
into place. Normally, the vehicle will immediately request a
charge, the green CHARGING light will turn on, and charging will
begin. Charging overnight is the most convenient way to ensure the
vehicle's full range will be available for the next day.
If the vehicle has stopped charging, the green "Charging" light will
turn off. Remove the cable and the vehicle is ready to use. If the
charging is still in progress, first push the button on the CS 3-Phase
front panel. The charging light will start blinking. Now remove the
connector.

Front Panel

The front panel has one GREEN and one RED light to indicate the
status of the CS 3-Phase. Please refer to Table 1 to check the status
of the EVSE.
Page 7

Advertisement

Table of Contents
loading

Table of Contents