Pacific energy ALT 1.2 Installation And Operating Instructions Manual page 16

Table of Contents

Advertisement

Procedure
1. Position stove and floor protection with hole for combustion air in accordance with the clearances as stated on the
label and in Figure 16.
2. Mark the position for the hole in the ceiling and roof by using a string and plumb-bob.
3. Check that the intended location will not interfere with floor joists, ceiling joists or rafters before proceeding further.
4. Cut a hole in the ceiling and roof to suit the chimney system and frame in the sides. The chimney support is mounted
to the framing.
5. Install all components to the chimney manufacturer's installation requirements. (Outside combustion air may be
required, consult local building codes. See "Combustion Air" on page 19).
The chimney may incorpo-
rate an offset. To do this
safely, all sections of listed
connector, offset elbows
and chimney section must
be screwed together by
at least three sheet metal
screws per joint. The
chimney must be suitably
supported by the chimney
manufacturer's listed offset
support.
*
Unit may be harder to start.
Please provide as much
vertical length for the first
section of pipe as possible.
5055.7298-A
Combustible Wall/Ceiling Installation
3' (914 mm)
Radiation shield
12"(305mm) minimum
Minimum 7' (2.1m.)
Ceiling height from
bottom of legs
12"(305mm)
Minimum first
section of pipe
48"
(1.2 m)
Attachments to floor
for mobile homes
*
3" diameter air inlet with rodent screen.
*
If the crawl space is well ventilated it is
not necessary to extend air inlet to outside
Figure 16: Alt 1.2 Combustible wall installation diagram.
16
Chimney
Minimum
Storm collar
Chimney
*
connector
Spark arrestor
Rain cap
Roof
flashing
Chimney
Support
Alternate
up and out
installation
Wall
Thimble
Non-combustible
floor protector
Hooded vent or
90° elbow turned
down
210618-28_ALT 1.2

Advertisement

Table of Contents
loading

Table of Contents