During the Discharge Test

During the discharge test the following parameters will be displayed:
[Time]: Total and remaining time left on the test
[DIS C]: String capacity discharged from batteries
[U]: Indicates total voltage of string
[I]: Indicates discharge current
[Min cell]: Indicates cell # and voltage reading of lowest cell
DAC Replacement
If at any point during use a DAC error occurs or is suspect of malfunction, it can be replaced
using a spare DAC.
To replace a faulty DAC
1. Unplug the faulty DAC
2. Plug in replacement DAC
3. Enter the number of the spare DAC (after starting the test) and press ENT
NOTE:
Replacing a DAC will reprogram its number. If DAC 3 replaced DAC 1, then DAC 3 will
become DAC 1. This can be reversed by plugging the original in and reassigning it the default
number.
Discharging of Strings in Parallel Connection
Parallel battery strings of the same nominal voltage can be discharged together. One SLB load
bank can discharge up to five battery strings connected in parallel.
Find Quality Products Online at:
Time
00:00:04/10:00
DIS C:
U: 0.0V
Min cell:001# 2.001V
Test Display during Discharge
03 # replace 1#
DAC Replacement (DAC#3 to replace DAC#1)
GlobalTestSupply
www.
0.0Ah
I: 0.0A
.com
SLB-Series User Manual
30
sales@GlobalTestSupply.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents