Testing Preparation

This section details how to connect all of the test leads and cables properly. Before working with
the equipment, be sure to check the following:
1. The battery strings are disconnected from the power supply
(If equipped, flipping the DC breaker on the power supply to OFF will accomplish this.)
2. There is adequate space for testing. Do not test the unit around explosive gas or vapor.
Standard load cables are 3m (10ft) in length. Its best to have the load bank as far from the
batteries as possible.
3. The nominal voltage of the load bank matches or exceeds that of the battery string.
(Ex. Do not use a 48V unit on a 125V battery system.)
4. There is not an excessive dust buildup on the load bank resistors or other components.
(If there is, blow off prior to powering unit on.)
IMPORTANT: Power supply and control on-off (circuit breaker) should be turned off before
making wire connections. To ensure safety, do not turn on the circuit breaker until all other
connections are finished.

Standard Cables

This section details connecting the standard test cables. These include the positive & negative
discharge cables, string voltage test leads, and AC power cord.
Positive Load
Cable
Negative Load
Cable
Load Cables
www.eepowersolutions.com | Tel: 1-877-805-3377 | Fax: 1-414-962-3660 | info@eepowersolutions.com | V1.1
Find Quality Products Online at:
syst
acquisition case
charge
T
communication
tot
exit
U
String Voltage
Lead
Power Cable
GlobalTestSupply
www.
SLB-Series User Manual
system
time
total
voltage
.com
sales@GlobalTestSupply.com
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents