Eagle Eye SLB Series User Manual page 11

Smart dc load banks
Table of Contents

Advertisement

*IMPORTANT: Some models will have (2) of each load cable connection as well as multiple
breaker switches. When there are multiple connections and breakers, all connections must
be made and all breaker switched must be on.
Before connecting the load cables, the best method of connection for your application should be
evaluated. The first method of connection is to use the provided clamp. Attach the discharge cable
to the clamp on the bolt as pictured below. The second method would be to directly connect the
load cable to the terminal also pictured below.
Find Quality Products Online at:
Disassembled Clamp
Clamp Connection
GlobalTestSupply
www.
SLB-Series User Manual
Assembled Clamp
Direct Connection