Assembly And Ink Filling; Checks Before Operations - Roland VersaUV LEC2-300 Setup Manual

Hide thumbs Also See for VersaUV LEC2-300:
Table of Contents

Advertisement

2. Assembly and Ink Filling

Checks before Operations

Completed Drawing
Necessary Tools (Included Items)
• Hexagonal wrench (1)
• Pipe (Use this when the hexagonal wrench is too short to easily tighten bolts) (1)
• Bolts (40)
• Washers (12)
24
2.Installation

Advertisement

Table of Contents
loading

Table of Contents