Roland VersaUV LEC2-300 Setup Manual page 28

Hide thumbs Also See for VersaUV LEC2-300:
Table of Contents

Advertisement

2. Assembly and Ink Filling
B
Attach the casters onto the stand leg.
Attach the casters so that they are a long distance from the stand stay. The casters have no particular front and
rear orientation. Tighten the bolts securely (eight locations in total). Loose bolts may cause the stand to wobble.
Tighten fully
Bolts: 8
C
Attach the arms to the stand.
Set the stand upright, and then fix the arms in place on the stand by tightening the bolts securely (12
locations in total on the left and right arms) in the order shown below. Loose bolts may cause the stand
to wobble.
Temporarily tighten the bolts in the four upper locations. (On the left and right sides for
a total of eight locations.)
Temporarily tighten the bolts in the two locations on the sides. (On the left and right
sides for a total of four locations.)
Fully tighten all the bolts to completely fix the arms in place on the stand.
Tighten temporarily
→ tighten fully
Bolts: 12
26
2.Installation
Bolt
Caster
Long
Stand leg
Short
Stand stay
Bolt
Arm (right)
Bolt
Hexagonal
wrench
Bolt
Keep the side with
the bolts in front.
Pipe
Caster
Bolt
Hexagonal
wrench
Arm (left)
Bolt

Advertisement

Table of Contents
loading

Table of Contents