Commissioning

!

Switching on the power supply

After switching on the external power supply and with the device switched off (switch SV on PU3f
in down position refer also to figure 9 page 21) LED "i" (red) lights up on the power supply units.

Switching on the device

After switching on the device (switch SV on PU3f in up position refer also to figure 9 page 21) the
OK LED (green) must light up on the power supply unit and the operating LED (green or red) on
the PU3f module. The alarm LED (red) must not light up if the device is receiving properly and the
levels are set correctly.
Connecting the service PC
A PC and the operating program PowerSys are needed for start up and for maintenance and di-
agnostic purposes for the SWT 3000 system. The PC is connected at the SUB-D socket on the
front panel of the PU3f module. A description of the operating program can be found in Chapter 3
of this equipment manual.

PC requirements

Operating system
Processor
Clock
System memory
CD drive
Serial interface
Printer interface (LPTx)
© SIEMENS AG 2008
Warning!
This equipment may be supplied from different and from each other inde-
pendent dangerous voltages.
Before starting the maintenance work the device must be isolated with
the specified separators.
Windows 2000 or Windows XP
Pentium
min 800 MHz
256 MB
RS 232
Edition p3_3_2x 08/09
Installation and Commissioning
Page - 31