Installation; Installation Process; Dip Switch Configurations; Table 8 Bnf Set Vend Denomination Switches Ds1 - JCM GLOBAL TBV Series Integration Manual

Transaction based validator
Table of Contents

Advertisement

3 INSTALLATION

Installation Process

Perform the following steps to install the TBV
Unit:
1. Place the TBV in its intended mounting location.
2. Bolt both the right and left sides of the TBV
Frame into its intended location using 8 Pan Head
Screws (4 on each side) from outside of the
Frame when this particular mounting configura-
tion is preferred (See Figure 7).
Figure 7 M4 Screw Locations (Right & Left Sides)
3. Remove the Cash Box and bolt the back side and
bottom side of the TBV Frame into its intended
location using 8 (eight) M4 Pan Head Screws
from the outside of the frame when this mounting
configuration is preferred (See Figure 8).
NOTE: The maximum length of the M4 Pan Head
Screws should be 4mm plus the thickness of the
Cabinet or mounting Bracket (See "TBV Entire
Unit Outside Dimensions" on page 27 of this
Guide to confirm each Screw pitch condition).
Figure 8 M4 Screw Locations (Bottom & Rear
Sides)
P/N 960-100925R_Rev. A {EDP #186705}
Transaction Based Validator Integration Guide

DIP Switch Configurations

This portion provides the denomination value DIP
Switch Block settings for the TBV Unit.
*. Not Applicable (N/A). Never Switched to ON.
*. Not Applicable (N/A). Never Switched to ON.
*. Not Applicable (N/A). Never Switched to ON.
7
4. Connect the TBV Unit to the Host Machine using
a packaged Harness, and then supply the power.
NOTE: To install the TBV Unit into a Host
Machine, affix at least two of the four side
dimension in place.
Table 8 BNF Set Vend Denomination Switches
DS1
ON
OFF
Switch No.
Switch ON
1
VEND 1 INHIBIT
2
VEND 2 INHIBIT
3
VEND 3 INHIBIT
4
VEND 4 INHIBIT
5
VEND 5 INHIBIT
6
VEND 6 INHIBIT
7
VEND 7 INHIBIT
*
8
N/A

Table 9 Set BNF Buzzer Volume Switches DS2

ON
OFF
Switch
Switch ON
No.
*
1
N/A
2
Performance Buzzer ON
3
ON Fixed
4
N/A*
Table 10 TBV Set Vend Denomination Switches
DS3
ON
OFF
Switch No.
Switch ON
1
VEND 1 INHIBIT
2
VEND 2 INHIBIT
3
VEND 3 INHIBIT
4
VEND 4 INHIBIT
5
VEND 5 INHIBIT
6
VEND 6 INHIBIT
7
VEND 7 INHIBIT
*
8
N/A
NOTE: When installing the BNF Section onto the
TBV-100 Unit, DIP Switch #3 settings will have no
effect. In this case, DIP Switch #1 on the BNF
Section must therefore be used for setting the
required denomination.
© 2010, Japan CashMachine Co, Limited
DS1
Switch OFF
VEND 1 ACCEPT
VEND 2 ACCEPT
VEND 3 ACCEPT
VEND 4 ACCEPT
VEND 5 ACCEPT
VEND 6 ACCEPT
VEND 7 ACCEPT
OFF (Fixed)
DS2
Switch OFF
OFF (Fixed)
Performance Buzzer
OFF
N/A*
OFF (Fixed)
DS3
Switch OFF
VEND 1 ACCEPT
VEND 2 ACCEPT
VEND 3 ACCEPT
VEND 4 ACCEPT
VEND 5 ACCEPT
VEND 6 ACCEPT
VEND 7 ACCEPT
OFF (Fixed)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tbv-100 fsh

Table of Contents