QUICK REFERENCE INSTALLATION INFORMATION
1.
Pneumatic Requirements: (One Hookup) Run 1/2" line to main Filter / Regulator with an output
of 4 CFM operating at 80 PSI.
2.
Electrical Requirements: (One Hookup) A 25 amp dedicated circuit should be supplied to the
main control panel.
3.
Installing Slide gate: Install the slide to supply bin. There should be wires that are labeled from
the slide gate that need to be connected into Junction box (1) located on the filler.. The wires
need be terminated in the J-Box for the Slide gate solenoids and the reed magnet, (used for
setting up the dribble position on the slide gate).
4.
See attached layout drawing for reference information.
5.
For Technical Assistance call main # 512.352.3694.
6.
For Equipment Sales call main office or email
If any clarification is required -- ASK US!
WARNING
The purpose of this section is to alert operating and maintenance personnel to the possible dangers
of this type of equipment. Serious injury and/or equipment damage could result from not heeding
these safety precautions.