Connecting To Supply Bin; Installation Summary - CBE 510 Safety, Installation, Operation, Maintenance

Bulk bagger
Table of Contents

Advertisement

CONNECTING TO SUPPLY BIN

Our 510 series Bulk Bag Fillers can be fed via slidegate valve, butterfly, valve, auger, rotary air lock.
The valve is fastened directly to the customer supply bin. An 8" flex connector hose has been supplied
to install from the outlet side of the valve to the bulk bag filler head. Care must be taken to ensure that
there is a minimum of 6" of flex house between the feeding valve assembly and the inlet to the filling
head of the filler. If not, the lack of flexibility between valve/feeder and scale can be detrimental to bag
weight accuracy
Note: Be sure the flex connector hose is long enough so you do not influence the scales.

INSTALLATION SUMMARY

Place the 510 series in the selected site.
Align with your discharge spout and connect with flexible collar
NOTE:
Assure that each leveling load foot is securely resting on the floor before jamming the load cell nut.
Be sure the equipment does not rock.
Be sure to have a minimum of a ¼" maximum of ½" clearance between the frame and the floor.
CAUTION:
If more than 1/2" clearance to floor is needed, the bottom of the leveling load foot must be
shimmed.
Be sure the leveling load foot bolt thread engagement is a minimum of 50% into each of the
load cells.
Tighten leveling foot lock nut against load cell being careful not to over tighten. This may cause
reading errors, which will require re-calibration.
17

Advertisement

Table of Contents
loading

Table of Contents