OWER CABLING
4.4

Cable installation

Before starting, check that none of the components of the drive is live. Read carefully
the warnings in chapter 1.
Place the motor cables sufficiently far from other cables
Avoid placing the motor cables in long parallel lines with other cables.
If the motor cables run in parallel with other cables note the minimum distances
between the motor cables and other cables given in table below.
The given distances also apply between the motor cables and signal cables of other
systems.
The maximum lengths of motor cables are 328 ft. (MR4), 492 ft. (MR5 and MR6) and
656 ft. (MR7 to MR9).
The motor cables should cross other cables at an angle of 90 degrees.
If cable insulation checks are needed, see chapter Cable and motor insulation checks.
Start the cable installation according to the instructions below:
4.4.1

Frames MR4 to MR7

1
Strip the motor and mains cables as advised below.
Earth conductor
A1
B1
Distance between
cables, [in]
11.8
39.4
C1
D1
MAINS
Figure 17. Stripping of cables
Shielded
cable, [ft]
≤ 164
≤ 656
Earth conductor
E
MOTOR