Commissioning Of The Smartvfd Hvac - Honeywell SmartVFD HVAC MR4 User Manual

Variable frequency drives for constant and variable torque applications
Table of Contents

Advertisement

Honeywell
• 41
5.1

Commissioning of the SmartVFD HVAC

1
Read carefully the safety instructions in Chapter 1 and above and follow them.
After the installation, make sure that:
both the drive and the motor are grounded.
the mains and motor cables comply with the requirements given in chapter
4.1.1.
the control cables are located as far as possible from the power cables,
see chapter 4.4.
2
the shields of the shielded cables are connected to protective ground
marked with
check the tightening torques of all terminals
the wires do not touch the electrical components of the drive.
the common inputs of digital input groups are connected to +24V or
ground of the I/O terminal or the external supply.
3
Check the quality and quantity of cooling air (chapter 3.2 and Table 6).
4
Check the inside of the drive for condensation.
Check that all Start/Stop switches connected to the I/O terminals are in
5
Stop-position.
Before connecting the AC drive to mains:
6
check mounting and condition of all fuses and other protective devices
7
Run the Startup Wizard (see the Application Manual).
.