OWER CABLING
Cut the rubber grommets open to slide the cables through. Should the grommets
fold in while inserting the cable, just draw the cable back a bit to straighten the
6
grommets up. Do not cut the grommet openings wider than what is necessary for
the cables you are using.
Place the grommet with the cable so that the frame end plate fits in the groove
on the grommet, see Figure 33.
To meet the requirements of the enclosure class NEMA12, the connection
7
between the grommet and the cable must be tight. Therefore, lead the first bit of
the cable out of the grommet straight before letting it bend. If this is not possible,
the tightness of the connection must be ensured with insulation tape or a cable tie.
As an example,see Figure 21.
Figure 32.
Figure 33.