Install The Capillary Pump (G1376A) - Agilent Technologies 1100 Series System Manual

Capillary lc system
Hide thumbs Also See for 1100 Series:
Table of Contents

Advertisement

1
Installing your Capillary LC System
analytical column in the TCC.
not crushed or broken by module front covers.
Avoid excessive bending. refer to

Install the Capillary Pump (G1376A)

WARNING
installation of all modules in the stack.
1 Ensure the line power switch at the front of the capillary pump is off.
2 Place the capillary pump on top of the micro WPS. Make sure that the two modules
are interlocked correctly.
3 Connect the power cable to the power socket at the rear of the capillary pump. Do
not connect the power cable to power until you have finished the hardware
installation of all modules in the stack.
4 Connect the free end of the CAN-bus cable from the micro sampler to one of the
CAN-bus connectors at the rear of the capillary pump.
5 Connect the pre-terminated end of the pump-to-sampler capillary (G1375-87310) to
the flow sensor outlet of the capillary pump. Connect the other end of this capillary
to port 1 of the sampler injection valve.
10
1100 Series Capillary LC System Manual
Connect the power cable to power only after you have finished the
hardware
NOTE
Carefully route all capillaries so that they are
Chapter 2
for advice on handling capillaries.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents