Install The Thermostatted Column Compartment (Tcc) (G1316A) - Agilent Technologies 1100 Series System Manual

Capillary lc system
Hide thumbs Also See for 1100 Series:
Table of Contents

Advertisement

1
Installing your Capillary LC System
8 Connect one end of the sampler-to-column capillary (G1375-87304) to port 6 of the
NOTE
Carefully route all capillaries so that they are not crushed or broken by module front
covers. Avoid excessive bending. See
9 Connect the large-bore corrugated plastic leak drain tubing to the micro sampler leak

Install the Thermostatted Column Compartment (TCC) (G1316A)

Connect the power cable to power only after you have finished the hardware
WARNING
installation of all modules in the stack.
1 Ensure that the line power switch at the front of the thermostatted column
2 Place the TCC on top of the micro sampler. Make sure that the two modules are
3 Connect the Can-bus cable (5181-1516) to one of the CAN connectors at the rear of
4 Connect the power cable to the power socket at the rear of the TCC. Do not connect
5 Connect the free end of the Can-bus cable from the micro sampler to the unused
6 Place the analytical column into the TCC. Observe the flow direction indicated on
16
1100 Series Capillary LC System Manual
sampler injection valve. The other end of this capillary will later be connected to the
inlet of the analytical column in the TCC.
drain fitting. Route the leak drain tubing to an appropriate waste container.
compartment (TCC) is off.
interlocked correctly.
the TCC.
the power cable to power until you have finished the hardware installation of all
modules in the stack.
Can-bus connector at the rear of the TCC.
the column. The column can later be secured using column clamp (5001-3702).
Chapter 2
for advice on handling capillaries.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents