Appendix C Environmental Requirements For Device Operation; Environmental Requirements For An Equipment Room; Requirements For Selecting A Site For An Equipment Room - Huawei AR100 Series Hardware Installation And Maintenance Manual

Enterprise routers
Hide thumbs Also See for AR100 Series:
Table of Contents

Advertisement

Huawei
AR100&AR120&AR150&AR160&AR200&AR1200&AR
1600&AR2200&AR3200&AR3600 series Enterprise
Routers
Hardware Installation and Maintenance Guide
Figure 9-77 Mold installed in the COAX crimping tool
Figure 9-78 An installed mold
----End
9.3 Appendix C Environmental Requirements for Device
Operation

9.3.1 Environmental Requirements for an Equipment Room

9.3.1.1 Requirements for Selecting a Site for an Equipment Room

When designing a project, consider the communication network planning and technical
requirements of the equipment. Also consider hydrographic, geological, seismic, power
supply, and transportation factors.
Construction, structure, heating and ventilation, power supply, lighting and fire-proof
construction of the equipment room should be designed by specialized construction designers
to suit the environmental requirements of devices. The equipment room should also follow
local regulations concerning the industrial construction, environmental protection, fire safety,
Issue 05 (2018-07-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Appendix
179

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents