7.4
15-30kVA Battery Cabinet Anchorage - Standard
Place the UPS in the final installation location.
Extend the threaded leveling feet until all weight has been removed from the casters and the UPS is level.
.
Front
Leveling
Feet
Leveling
Feet
DETAIL - Load Leveling Foot
20.12 in (511 mm)
FIGURE 7.4 – FOOTPRINT FOR 15-30 KVA BATTERY
CABINET USING LOAD LEVELING FEET
18
4400 Series UPS Battery Cabinet Installation and Operation Manual – 69445-005