50-100kVA Battery Cabinet Anchorage - Standard

Install the anchor bolts per Section 7.3 in the pattern shown in Figure 7.5.
Secure the UPS Angle Bracket skids to the floor with the anchor bolts..
80/100 kVA FOOTPRINT - BOTTOM VIEW
2.5 in (64 mm)
27.1 in (689 mm)
2.0 in (51 mm)
Angle Bracket
Skids
FRONT
50-100kVA ANCHORAGE SPACING
Back
4 x 0.703 in Dia. (17.9 mm)
Front
27.1 in (689 mm)
FIGURE 7.5 ANCHORAGE HOLE LOCATIONS – 50-100KVA BATTERY CABINET