1. Installation
1
DIL switch 1:
reserved
2
DIL switch 2:
reserved
3
DIL switch 3:
setting the
diagnostic mode
4
DIL switch 3:
setting the
station number
Fig. 1/3: DIL switch in the field bus node
1-10
1
4
Reserved DIL switches
1
Leave all switch elements of the 2-element DIL switches 1 and
2 at OFF:
Reserved
Fig. 1/4: Setting of the 2-element DIL switch
ON
ON
1 2
1 2
and
2
Festo P.BE-CPX-FB13-EN en 0112NH
2
3