ADJ MDF2-9SYS User Manual page 17

Hide thumbs Also See for MDF2-9SYS:
Table of Contents

Advertisement

I N S T A L L A T I O N I N S T R U C T I O N S
PANEL SET UP INSTRUCTIONS
9.   Once all panels have been placed, install the unpowered edging ramps around the remaining
edges of the panel assembly using the docking magnets and the connection brackets.
10.   S lot the corner ramps in place at each corner of the panel assembly. It can be helpful to lift
both adjacent edge ramps slightly in order to align the corner ramp, the edge ramps, and the
connection bracket. Once aligned, the three ramp pieces should fall easily into place.
One of the corner ramps includes a small cutout for the power cable and DMX line, and may
be used at the corner where the cables run out from the row of power supply ramps.
Alternately, this corner may simply be left open.
INSTALLATION COMPLETE!
17

Advertisement

Table of Contents
loading

Table of Contents