Installation
13. Connect like colored wires from the UMP to like colored wires from the male connector with wire nuts. When
finished connecting the wires, neatly coil them inside the packer's wiring compartment (see Figure 14).
14. Lubricate the o-ring on the packer wiring compartment cover (with lifting eyebolt) with petroleum based jelly.
Screw in the packer wiring compartment cover (thread sealant should not be used). Torque to 35 ft-lbs (50
N•m).
WARNING
Confirm that the lifting eyebolt is properly torqued to 10 ft-lbs (13.6 N•m) with a
minimum of 6 full threads installed. Occasionally, eyebolts are removed after pump
installation and corrosion may occur in the threaded areas of the wiring compartment
cover (eyebolt plug) and the eyebolt. If corrosion has occurred, the cover and eyebolt
should be replaced.
15. Utilize the lifting eyebolt to suspend the pump vertically and then install the pump onto the riser pipe using UL
classified for petroleum, non-setting thread sealant until watertight and align appropriately to connect to the
product line piping. For E85AG applications, Loctite 564 is recommended for all field serviceable pipe
threads.
When servicing equipment, use non-sparking tools and use caution when removing or
installing equipment to avoid generating a spark.
Male connector in
packer housing
Female connector in
manifold housing
rjpumps\fig31.eps
Figure 14. Connecting UMP To Packer Wiring
UMP pigtail wires
17
Installing the Pump
Remove cover to access
packer wiring compartment
Need help?
Do you have a question about the Quick-Set VSFC Submersible Turbine Pump and is the answer not in the manual?
Questions and answers