Repo Installation - Avaya 1 Series Site Preparation, Installation And Operator's Manual

200-240 v
Table of Contents

Advertisement

Installation

REPO Installation

The REPO switch is a customer-supplied switch that can disconnect
UPS output voltage from your protected equipment. If you are using a
REPO switch, you need a junction box, external wiring, and a switch
with the following specifications:
S
S
S
38
22. See the following table for specifications and tightening torque.
Power Cable Terminations
Wire Function
Input
Ground
L1
L2/Neutral
Output L1
p
L2/Neutral
Ground
No
Connection
*Use #16-AWG (1.5 mm
23. Replace the terminal box cover.
24. If you are using a REPO switch, follow the instructions in the
following section, "REPO Installation."
25. Start the UPS according to the "UPS with Bypass Module
Startup" procedure on page 40.
Only qualified service personnel (such as a licensed electrician) should perform the
hardwired installation.
The switch should be a wall-mounted, momentary-contact, normally
open, pushbutton switch.
Minimum ratings of 240 Vac and 35 mA.
Wire should be 18 AWG (0.75 mm
Avaya Model 3000 UPS Operator's Manual
Terminal
Terminal
Position
Wire
Size Rating*
1
22 - 12 AWG
2
(0.34 - 4 mm
2
3
18 - 10 AWG
18 - 10 AWG
2
(0.75 - 6 mm
5
6
8
22 - 12 AWG
22 12 AWG
4, 7
2
(0.34 - 4 mm
2
) 75
C copper wire minimum.
°
W A R N I N G
2
) minimum.
167-405-119 Issue 6 Uncontrolled Copy
S
Tightening Torque
Entrelec
Phoenix
Contact
3.5 - 5.3 lb in
5.6 - 6.8 lb in
)
3.5 - 5.3 lb in
3 5 5 3 lb i
4.5 - 7.0 lb in
4 5 7 0 lb i
)
3.5 - 5.3 lb in
5.6 - 6.8 lb in
)

Advertisement

Table of Contents
loading

This manual is also suitable for:

3000 va

Table of Contents