3-3-3. Today's Schedule
Touch [Schedule Settings] in the menu bar, and then touch [Today].
On the Today's Schedule settings screen, schedules can be set for the current day without modifying the weekly or
annual schedules.
Note: Set the [Schedule] setting on the operation settings screen to [Available] to enable the scheduled events. (Refer to section
3-1-5 "Operation settings screen" for details.)
Note: Be sure to set the contents of schedule in a way that will not impact on the next day's operation. For example, if Prohibit
setting of remote controller operation is made for any time such as 17: 00, Permit setting needs to be made for any time
before the date changes such as 23: 59.
[1] Selecting a target to which the schedule will be applied
(1) On the [Floor] or [Block] display, select a group(s),
block(s), or floor(s) to which the schedule will be applied.
(Refer to 3-1-4 "Selecting the icons of the groups to be
operated" for details.)
[2] Setting the contents of the schedule
(1) Touch the row of the schedule to be set in the "Contents of Schedule" section to display the schedule settings
screen.
Set the start time to apply to the schedule, set the operations to be scheduled, and then touch [OK]. (Refer to
section 3-3-1 [3] for details.)
[3] Saving the schedules
To undo the changes made, touch [Cancel] before
saving the schedules.
After completing the settings, touch [OK] to save the
schedules.
Note: To delete each scheduled events, touch the "Delete"
button in the row of the schedule to be deleted.
[4] Copying a schedule to another group
(1) Refer to 3-3-1 [6] for details.